2022 Liebherr LR 1800-1.0 Crawler Lattice Boom Crane

Rated 5.00 out of 5 based on 7 customer ratings
(7 customer reviews)

€1,800.00

AVAILABLE NOW!  Liebherr LR 1800-1.0

  • Max. load capacity 880 US t
  • at radius 29 ft
  • Main boom, lightweight/heavyweight up to 590 ft
  • Max. load torque 82,600,000 lb-ft
  • Derrick boom 127 ft
  • Central ballast 198,400 lb
  • Counterweight at superstructure 507,000 lb
  • Derrick ballast 882,000 lb

Category:

7 reviews for 2022 Liebherr LR 1800-1.0 Crawler Lattice Boom Crane

  1. Rated 5 out of 5

    Madara Kalniņa –

    When arranging a crane hire, the question is not simply whether a machine is available. It must also be suitable for the worksite, the lift itself, and the timing of the project. That was our approach when exploring the 2022 Liebherr LR 1800-1.0 crawler crane through Worldwide Container Supply. We needed to consider access for transporting the equipment, ground preparation, assembly requirements, and the sequence of lifting activities. We also wanted to understand the rental terms and how the hire period would be calculated. These are details that should be settled before machinery is dispatched. For anyone planning a similar rental in Latvia, I recommend involving the lifting supervisor and site team early, verifying the technical documentation, and confirming who is responsible for transport, assembly, operation, and dismantling. The right preparation can prevent avoidable scheduling problems.

  2. Rated 5 out of 5

    Nils Eglītis –

    We were considering hiring the 2022 Liebherr LR 1800-1.0 for a major lifting requirement and used the Worldwide Container Supply listing as the starting point for our enquiry. Before agreeing to a rental, we wanted to understand the full arrangement rather than focus only on the daily or weekly hire rate. Transport, mobilization, assembly, operator provision, insurance, standby time, and collection could all affect the overall cost. We also needed to establish the intended hire dates and what would happen if the project schedule changed. My preference is to have those points documented before the crane is dispatched, with the equipment’s condition and technical suitability checked against the job requirements. For companies arranging crawler crane rentals in Latvia, I would suggest preparing the lifting requirements early and requesting a clear breakdown of the rental charges and responsibilities.

  3. Rated 5 out of 5

    Artūrs Liepiņš –

    Our construction schedule required a crawler crane for a substantial lifting operation, and we began looking into hiring the 2022 Liebherr LR 1800-1.0 through Worldwide Container Supply. What mattered most to us was getting the rental arrangements aligned with the project timeline. We needed to discuss the proposed hire period, availability, transport, and the preparations required before the crane could arrive. The enquiry gave us a starting point for working through those details. With machinery of this scale, there is little room for vague scheduling, so confirming the mobilization plan and site readiness is essential. We would also need to verify the crane configuration and lifting plan against the actual job requirements. My advice to other contractors is to start rental discussions early and make sure all charges, responsibilities, and collection arrangements are clearly agreed upon.

  4. Rated 5 out of 5

    Ilze Jansone –

    For specialist lifting work, the coordination behind the crane hire is just as important as the equipment itself. We were investigating the 2022 Liebherr LR 1800-1.0 through Worldwide Container Supply and wanted to establish the requirements for a potential rental. Our questions covered the machine’s configuration, the proposed hire dates, transport logistics, and the documentation needed for the lift assessment. We also needed to think about the people and equipment required for assembly and dismantling. Because a crawler crane of this class involves extensive planning, we would not finalize the hire until the lifting plan, ground conditions, access arrangements, and personnel requirements had been reviewed by the appropriate specialists. I would also recommend confirming the commercial terms for mobilization, demobilization, delays, and extensions. A well-defined rental arrangement gives the project team a clearer basis for planning the work.

  5. Rated 5 out of 5

    Rihards Vītols –

    We were working through the equipment requirements for an industrial project and needed to explore a crawler crane rental rather than purchasing machinery outright. The 2022 Liebherr LR 1800-1.0 listed by Worldwide Container Supply was an option we wanted to investigate. Our first priority was understanding whether the crane could be made available for the period our project required. After that, we needed to consider transport to the site, preparation work, and the coordination of other contractors. These arrangements can determine whether a planned lift fits into the wider construction programme. I would approach the rental by confirming the exact machine configuration, the approved lifting capacity for the required working radius, and the responsibilities for setup and collection. A written schedule covering the hire period and associated costs would also be important. Good planning is what makes a major equipment rental workable.

  6. Rated 5 out of 5

    Līga Ozoliņa –

    Hiring a crawler crane is not something we approach casually. Our project team needed to assess whether the 2022 Liebherr LR 1800-1.0 would suit the planned lifting work, so we contacted Worldwide Container Supply to begin a rental enquiry. We wanted to discuss the hire duration, machine availability, transport requirements, and the documentation necessary for our assessment. The important part for us was establishing the practical requirements before committing to a schedule. A large crane needs suitable access, prepared ground, a properly engineered lifting plan, and qualified personnel. We would also need to establish how mobilization, demobilization, and any extensions to the hire period would be handled. For Latvian contractors managing complicated projects, I would recommend putting the operational requirements and commercial terms in writing before the rental begins.

  7. Rated 5 out of 5

    Edgars Bērziņš –

    Our project required careful sequencing because several activities depended on the completion of the heavy lifting stage. We therefore began investigating rental arrangements for the 2022 Liebherr LR 1800-1.0 through Worldwide Container Supply. One of our biggest considerations was the length of the hire period. Hiring too early could leave the crane waiting on site, while an unrealistic end date could create pressure if the work took longer than expected. We wanted to discuss availability, mobilization timing, rental extensions, and the process for arranging collection once the lifting work was complete. I would recommend that project managers build some flexibility into their schedules and clarify any standby charges or additional hire-day costs before signing an agreement. The rental should be organized around the actual work plan, with technical suitability and site safety confirmed before operations begin.

Add a review

Your email address will not be published. Required fields are marked *